Discuss of Dredging Project Construction Technological Process in Paomatan Beach in Yuanshui
Though the concrete construction character of Paomatan .Taoyuan, this article introduce the following construction techniques such as how ro use GPS to do laying-off measurement in me sault and ford construction, and analyze how to use section method to control and design me riverbed, assure roe quality of chamfer, use movable Mock to solve pull shortage of main cable on bucket dredge.
sault and ford construction GPS Laying-off section method movable block pull.
Liu Xinmin
Hunan Navigation Engineering Corp., Changsha Hunan ,410005
国际会议
The First China International Dredging Congress and Exhibition(中国第一届国际疏浚技术发展会议)
上海
英文
214-218
2003-11-26(万方平台首次上网日期,不代表论文的发表时间)