Application of Dyke Fortification through Silt-pumping in Yellow River Dyke Reinforcement Project
Since dyke fortification through silt-pumping (DFSP) was first introduced by The First Yellow Rtver Management Bureau, Wuzhi County, Henan Province in 1991, it has been applied extensively in Yellow River dyke reinforcement projectt. Based on the experience of the authors, the application of booster ptunp in long-distance sand transportation of Yellow River is described. Equipment wear and tear and pipe material selection are also discussed.
dyke fortification through silt-pumping project design booster pump long-distance sand transportation wear and tear pipe material
Liu Guimin Lin Shuli Li Huaiqian Feng Lihai Wang Wendong
The First Yellow River Management Bureau Henan, Wuzhi, 454950
国际会议
The First China International Dredging Congress and Exhibition(中国第一届国际疏浚技术发展会议)
上海
英文
225-229
2003-11-26(万方平台首次上网日期,不代表论文的发表时间)