The Research of New Network Architecture of Protection and Control Device in Substation

  The paper presents the configuration principle on near-process installation of protection and control device firstly,regarding to problems and challenges relevant to equipment configuration and telecommunication network brought up by secondary device near-process installation in substation.Then,the solutions of secondary near-process device configuration are also proposed which include relay protection within both standalone bay and across bays,bay control unit and public terminal,etc.In addition,two telecommunication solutions are also given based on the above,which include two aspects,the first is the network architecture with MMS/SV/GOOSE network all in one based on PRP,and the second is HSR network which is independent on switch.Finally,network performance is estimated and compared quantized.

near-process installation network architecture multi-HSR PRP MMS/SV/GOOSE network public terminal synchronous sampling

ZHENG Yuping WU Tonghua DAI Wei ZHOU Hualiang LI Yanxin JIANG Yuan

State Key Laboratory of Smart Grid Protection and Control,Nanjing 211106,China;NARI Group Corporatio State Key Laboratory of Smart Grid Protection and Control,Nanjing 211106,China;NARI Technology Co.Lt State Key Laboratory of Smart Grid Protection and Control,Nanjing 211106,China;NARI Technology Co.Lt NARI Technology Co.Ltd.,Nanjing 211106,China

国内会议

“紫金论电”2017智能电网保护和运行控制国际学术研讨会

南京

英文

174-181

2017-08-12(万方平台首次上网日期,不代表论文的发表时间)