会议专题

NIAOT & TMT/WFOS

Outline The work done and ongoing with WFOS Mini-Study phase:2014.4-2015.3 (done)OMDR phase:2016.1-2017.5 (done)CoDP1:2017.7-2018.4 (ongoing)Overlaps Fiber concept design Coating design Manufacture capability

Hangxin Ji

Thirty Meter Telescope

国内会议

中国-国际三十米望远镜天文台合作会议(TMT WFOS China Partnership meeting)

上海

英文

1-31

2017-10-16(万方平台首次上网日期,不代表论文的发表时间)