会议专题

Optimized Scheduling Model for Crop Cultivation System Based on Bottleneck Decomposition Method

  This study focuses on characteristics of a single bottleneck flow-shop problem in the crop cultivation line and suggests an optimized bottleneck decomposition scheduling method.The main objective is to minimize job completion time in the crop”s cultivation line.The whole scheduling problem for the crop”s cultivation line can be achieved by using this suggested method.Compared with other scheduling methods, the proposed scheduling method can be verified to obtain better scheduling performance with fast convergence speed and optimized algorithm running time.What”s more, the suggested scheduling method performs better especially under the circumstance of high bottleneck degree and increased number of jobs.The suggested optimized bottleneck decomposition scheduling method has been applied to a crop cultivation factory and can be shown to obtain better scheduling performance.

Scheduling Flow-shop Decomposition Bottleneck Non-bottleneck Crop cultivation system

Shunkui Ke Doudou Guo Yubin Miao Qingliang Niu Danfeng Huang

School of Mechanical Engineering, Shanghai Jiao Tong University, China;School of Agriculture and Bio School of Agriculture and Biology, Shanghai Jiao Tong University, China School of Mechanical Engineering, Shanghai Jiao Tong University, China

国内会议

2015第四届中国·寿光国际设施园艺高层学术论坛

山东寿光

英文

208-211

2015-04-01(万方平台首次上网日期,不代表论文的发表时间)