会议专题

先正达世界领先的制造业持续发展原则

World Class Manufacturing,Visual shopfloor planning,Changeover reduction,Golf ball game,Changeover video analysis workshop,Total Productive Maintenance,Visible workplace,The numbers game,Direct line feed,Supplier managed inventory,Standard operating procedures,Visual performance measures。Typically 95% of manufacturing lead-timeis non value added,Is a physical reorderingsystem-linking suppliers&customers。Supplies only the parts thatare required(pull system)。Is controlled by the shopfloor。Visual Shopfloor based scheduling should be used to maximise responsiveness and performance。

制造业 可持续发展 供需关系

吕健

国内会议

第二届农药制剂工程及生产研讨会

上海

中文

1-61

2015-06-03(万方平台首次上网日期,不代表论文的发表时间)