会议专题

Recent Advancement of MC Silicon Wafers and Further Development Targets

Roadmap towards grid parity of PV power The system cost needs to be further reduced about 30 %.The module cost needs to be reduced about 30 %.The wafer cost needs to be reduced about 30 %.What to do for wafers 30 %cost reduction(in 2016CSPV presentation)

Yuepeng Wan

GCL-Poly,CTO

国内会议

第十三届全国太阳级硅及光伏发电研讨会

徐州

英文

1-20

2017-11-16(万方平台首次上网日期,不代表论文的发表时间)