会议专题

All-Back-Contact PEDOT:PSS/c-Si Heterojunction Solar Cell

Problem of Front-PEDOT structure 1.Parasitic absorption ofPEDOT:PSSfilm 2.Conformably coating is too difficult in textured-Si substrates,which limits improvement of efficiency.

Hao Lin Dong Ding PingQi Gao Wenzhong Shen

Institute of Solar Energy,Department of Physics and Astronomy,Shanghai Jiao Tong University,Shanghai Institute of Solar Energy,Department of Physics and Astronomy,Shanghai Jiao Tong University,Shanghai Ningbo Institute of Material Technology and Engineering,Chinese Academy of Sciences,P.R.China

国内会议

第十三届全国太阳级硅及光伏发电研讨会

徐州

英文

1-10

2017-11-16(万方平台首次上网日期,不代表论文的发表时间)