A Chance Maximization Model for Uncertain Project Scheduling Problem

  Project scheduling problem is to make a schedule for allocating the loans to a project so as to balance the total cost and the completion time under some constraints.This paper mainly researches on an uncertain project scheduling problem, of which the activity duration times are uncertain variables.In order to satisfy different management requirements, a new chance maximization model for uncertain project scheduling problem is built.Moreover, the equivalent crisp form of the proposed model is derived, and a genetic algorithm is introduced to search for the optimal schedule.Finally, the effectiveness of the algorithm is illustrated by a numerical experiment.

project scheduling problem uncertain programming uncertainty theory genetic algorithm

Yufu Ning Xiao Wang Xiangying Li

School of Information Engineering, Shandong Youth University of Political Science, Jinan 250103, China;Key Laboratory of Information Security and Intelligent Control in Universities of Shandong, Jinan 250103, China

国内会议

第十三届中国不确定系统年会暨第九届中国智能计算大会

长春

英文

173-180

2015-07-25(万方平台首次上网日期,不代表论文的发表时间)