会议专题

Rescheduling Trains with Scenario-Based Fuzzy Recovery Time Representation on Two-Way Double-Track Railways

  Severe weather conditions and inherent uncertainties in various components of railway traffic systems can lead to equipment breakdown and reduced capacity on tracks and stations.This paper formulates a two-stage fuzzy optimization model to obtain a robust rescheduling plan under irregular traffic conditions,and a scenario-based representation is adapted to characterize fuzzy recovery time durations on a double-track railway line.The model aims to minimize the expected total delay time in the rescheduled train schedule with respect to the original timetable.Two decomposed sub-models are further developed corresponding to the trains in different directions,and then GAMS optimization software is used to obtain the robust rescheduling plan.The numerical experiments demonstrate the effectiveness of the proposed approaches.

Train Rescheduling Two-Stage Fuzzy Programming Discrete Fuzzy Variable

Lixing Yang Xuesong Zhou Ziyou Gao

State Key Laboratory of Rail Traffic Control and Safety Beijing Jiaotong University,Beijing,100044,C Department of Civil and Environmental Engineering University of Utah,Salt Lake City,UT 84112-0561,US

国内会议

第六届中国智能计算大会

开封

英文

39-54

2012-05-25(万方平台首次上网日期,不代表论文的发表时间)