Study on ATC between regions by considering optimized generation scheduling
The relationship between the buses that generate power and transmission lines is deduced by using of DC power flow model firstly.And by considering basic security stability constraints,the optimized model is built to obtain maximum ATC on transmission lines between two regions under different generation scheduling based on linear prograrnrning method.Then ATC is calculated by repeated power flow according to optimized generation scheduling.Simulations are carried out on IEEE-30-bus power system,and results show that the ATC is bigger under optimized generation scheduling than that under other generation scheduling,which can be referential for planning and dispatching of power system.
DC power flow model ATC Linear programming repeated power flow generation schedule
Ruyang SUN Jing SUN
dept.School of Automation Science and Electrical Engineering,Beihang University,BeiJing,China
国内会议
北京
英文
1435-1440
2011-10-20(万方平台首次上网日期,不代表论文的发表时间)