A FAHP-Based Method in Optimization Decision-Making of Load Transfer under the Transformer Fault
In order to greatly guarantee customer”s demands under the transformer fault or N-1 maintenance,it is important to transfer de-energized loads to other adjacent substations by load transfer schemes.However,as to the complexity of grid structure,there may be several available schemes which may embrace one of more transfer paths.And the schemes of load transfer that come out from experience usually are feasible,but not always optimal.But in the day of increasing tense in energy source,people are concerning about not only its feasibility but also its economy,stability and swiftness.Aiming at this problem,this paper proposes an Optimal Decision-making Model which considers these factors and obtains the optimizing load transferring strategy by use of Fuzzy Analytic Hierarchy Process(FAHP).In the end,the feasibility and effectiveness of this method are verified through an example.
transformer fault load transfer FAHP optimal decision-making
Qiuhong Wei Jing Sun
dept.School of Automation Science and Electrical Engineering,BeiHang University,Beijing,China
国内会议
北京
英文
1441-1447
2011-10-20(万方平台首次上网日期,不代表论文的发表时间)