Energy Consumption Analysis and Energy Saving Solutions in Qilidian WWTP

  This paper is going to research the energy saving and optimization of Qilidian Waste Water Treatment.The survey of energy consumption from Wastewater treatment plant shows that consumption of the secondary settling process is the largest which is about 69.15% of total energy consumption,followed by pre-treatment unit which is about 28.67% of total energy consumption.There are high energy consumption equipments that are the air blower,upgrade pumps,return pumps and plug-flow,etc.For these High energy consumption devices,the major energy saving measures is taken: Choosing the correct pumps to go with them according to the different flow rate,changing the current to reduce the energy consumption,improving the conditions of oxidation ditch water,choosing Good quality imported floeculants to reduce the usage of flocculant.Through these saving measures,the wastewater treatment plant improve its processing scale,meanwhile its treatment energy consumption has been reduce by 22%.

Wastewater treatment plant upgrading energy saving

Zhou Hongtao Sun Xiaojie Wang Dunqiu

College of Environmental Science and Technology,Guangxi Key Laboratory of Environmental Engineering and Protecting Assessment,Guilin University of Technology,Guilin,541004,China

国内会议

第三届中国能源科学家论坛

北京

英文

885-890

2011-10-20(万方平台首次上网日期,不代表论文的发表时间)