会议专题

Failure Analysis and Countermeasures Discussion of a Cracked Leak off Tube in Primary Heat Transport and Heavy Water Collection System

  Chemical composition analysis, microstructure analysis, macro and micro fracture morphology analysis were conducted on a cracked leak off tube in primary heat transport and heavy water collection system of TQNPC.The results show that the material conforms to the original design requirements.The leaked fluid vaporized at the penetration and stress corrosion crack initiated because of cl-concentration.The leaked fluid drains periodically and lead the wall surface temperature periodically changes.The SCC crack transformed to corrosion fatigue crack and the tube fmally fractured.In order to prevent the similar tubes crack again, preventive maintenance strategies were given in this paper.

nuclear power plants failure analysis concentration stress corrosion crack corrosion fatigue

Liang Zhao Kunjie Luo GuangFu Li Rong Wan

CNNC Nuclear Power Operations Management Co,Ltd.Haiyan, Zhejiang, China Suzhou Nuclear Power Research Institute Suzhou, Jiangsu, China Shanghai Key Lab for Engineering Materials Evaluation, Shanghai Failure Analysis & Safety Evaluation

国内会议

The 4th International Symposium on Materials and Reliability in Nuclear Power Plant(第四届核电站材料与可靠性国际研讨会)

沈阳

英文

164-171

2015-09-20(万方平台首次上网日期,不代表论文的发表时间)