Using Monte Carlo Method to Analyze Project Time

  It”s important for successful finish project to accurate analysis and control construct project.Traditional methods such as PERT and CMP only pay attention to average time of critical path.But it neglects non- critical paths whose work time can exceed critical path”s time.This paper suggests that applying Monte Carlo method to calculate the time limit of project can get the distribution of the project time of all paths.So the reliability data of project schedule can be got.And this paper offers a project example.Using Matlab to operate Monte Carlo method,which changes the difficult and longtime consumed calculation into sample and quickly.So the Monte Carlo method can be used practically.

Monte Carlo method project time analysis Control optimization Matlab

Chuan-Ming ZHANG Yang WANG

Shandong Provincial Key Laboratory of Civil Engineering Disaster Prevention and Mitigation,Qingdao,C Shandong University of Science and Technology,Qingdao,China

国内会议

2014年国际计算机科学与软件工程学术会议

杭州

英文

1-6

2014-10-18(万方平台首次上网日期,不代表论文的发表时间)