The generator start-up sequence optimization following a blackout

  After black-start(BS) generator restarts successfully during system restoration process, it is a primary task to provide cranking power to non-black-start(NBS) generators.A two-step optimal generator start-up sequence method for power system restoration is proposed in this paper.In step Ⅰ, the generator which is easiest to restart is selected as the first generator for safe restoration.In step Ⅱ, a multi-objective optimization model which has a primary objective and two secondary objectives is built with consideration of the influence of restoration paths.A neighborhood is designed by the neighborhood search method to ensure the quality of solutions according to the solution of the primary objective.DE-EDA is applied to search pareto optimal solutions in the designed neighborhood.Simulation results of a practical power system demonstrate the two-step method can take less time to determine several pareto optimal generator sequences and corresponding restoration paths and has potential to be used to guide restoration process in real time.

power system restoration two-step method generator start-up sequence neighborhood search method multi-objective optimization model

Hainan ZHU Yutian LIU

Key Laboratory of Power System Intelligent Dispatch and Control of Ministry of Education,Shandong University,17923 Jingshi Road,Jinan 250061,China

国内会议

中国电机工程学会电力系统专业委员会2014年学术年会

北京

英文

150-159

2014-08-01(万方平台首次上网日期,不代表论文的发表时间)