DC Interference Testing and Mitigation of New Electrically Isolated Pipelines Installed within Congested Existing Pipeline Network

  Congested existing buried piping or pipeline networks ”within” or ”close to” old plant facilities such as, gathering centers, booster stations, pipeline manifolds, etc.are normally electrically continuous to each other and are protected by common impressed current cathodic protection (CP) systems.However, new Pipeline/piping sections installed at such congested network are sometimes required to be electrically isolated from existing pipelines and are provided with separate impressed current CP systems.This paper discusses, methods implemented in design, installation, testing and commissioning of CP system of electrically isolated new pipeline sections, with special emphasis on DC stray current interference due to existing anode ground beds and existing pipelines crossing/parallelism.Case studies are included, with discussions on results of interference testing, interference mitigation, post interference mitigation surveys and protective potential surveys.

Cathodic protection commissioning interference stray current pipelines

Saleh Al-Sulaiman Hasan Sabri Amer Jaragh Renish Rahim

Inspection and Corrosion Team,Kuwait Oil Company,Ahmadi,Kuwait

国内会议

2013中国国际管道会议暨第一届中国管道与储罐腐蚀与防护学术交流会

廊坊

英文

408-415

2013-09-01(万方平台首次上网日期,不代表论文的发表时间)