Study on process of ultra-low sulfur steel

  This paper study on two process routes of ultra-low sulphur steel,”Hot metal desulphurization-Basic oxygen furnace-Ladle powder injection-LF refining” and ” Hot metal desulphurization-Basic oxygen furnace-LF refining”,that conclude the first route can achieve the fast production of ultra-low sulfur steel,Ladle powder injection cycle less than 19min,LF refining desulfurization cycle is less than 30min;The second route must strengthen sulfur content control before LF refining and must ensure a sufficiently long period,can make the sulfur content requirements that the sulphur content control below 0.008% before LF refining and refining cycle more than 40min,the control of sulfur content of less than 0.0010% can meet the requirements of the product by the two process routes.

ultra-low sulfur ladle powder injection LF refining process routes

LIU Jingang HAO Ning LI Zhanjun JIANG Zhonghang WANG Wenjun ZHU Zhiyuan

Shougang Research Institute of Technical,Beijing 100043,China Shouqin Metal Material Company Ltd.,Qinhuangdao 066326,Hebei,China

国内会议

第五届宝钢学术年会

上海

英文

1-4

2013-06-01(万方平台首次上网日期,不代表论文的发表时间)