会议专题

电渣重熔技术生产大型锻件用钢锭的最新发展(英文版,论文)

  Recently,INTECO special melting technologies has been assigned with the design and delivery of various large sized ESR furnaces up to 250 tons.Since that time some of these projected ESR plants were erected and commissioned.The present paper deals with these design and engineering challenges for large sized ESR plants.Results are given regarding the electrical,mechanical as well as operational parameters due to practical relevant data and will be compared with the previously calculated and predicted ones.A special focus lies on a well-controlled electrode change operation which is a precondition when producing big ESR ingots.Furthermore,the main melt station and its high current line of INTECO”s large ESR furnaces is designed to enable the application of the CCM)-Technology(current conductive mold)which is further explained.<br>  Ultimately,the results show that the big ESR ingots,which have been produced so far,have a good surface appearance and a well controlled chemical composition.

钢锭生产 电渣重熔技术 参数优化 质量控制

M.Kubin A.Scheriau M.Knabl B.Ofner M.Ramprecht H.Holzgruber

INTECO special melting technologies GmbH,AUSTRIA,奥地利

国内会议

2012中国国际自由锻会议

郑州

中文

347-353

2012-05-28(万方平台首次上网日期,不代表论文的发表时间)