会议专题

Exploration and Practice of Integrated Control & Management Mode of the Hydro Plant Group along Wujiang River Basin

Aiming at the fact that cascading hydro power plants along Wujinag River were operated individually,this paper proposes the remote integrated management mode of cascading hydro plants,demonstrates the process of establishing the integrated control center of Wujiang River,analyzes the beneficial results achieved in recent years,and finally suggests the future development.

Cascading Hydro Plant Group Integrated Management Dispatching Energy Saving

JIN Ze-Hua

国内会议

第二届水力发电技术国际会议

北京

英文

90-93

2009-04-20(万方平台首次上网日期,不代表论文的发表时间)