Necessity of Centralized Control Scheduling of Cascade Hydropower Stations and the Effect to Energy-saving Emission Reduction
The nation vigorously carries out energy-saving power generation scheduling policy.This paper analyzes the necessity and feasibility of centralized control scheduling of cascade hydropower stations.Take specific basin as an example,analysising the benefits of centralized control scheduling of cascade hydropower stations in enhancing water resources utilization,improving security of the power grid,and energy-saving emission reduction.
cascade hydropower stations power generation Optimal scheduling energy-saving emission reduction
Ma Guangwen Qin Yuyi Zhu Yanjun
Energy Development Center of Sichuan University, Chengdu 610065 Sichuan Electric Power Company,Chengdu 610041
国内会议
北京
英文
151-154
2009-04-20(万方平台首次上网日期,不代表论文的发表时间)