杭州热电厂220t/h循环流化床锅炉调试问题探讨Discussion on Commissioning of 220t/h CFB Boiler in Hangzhou Thermalpower Plant
Abstrac The questiones during the commissioning of HG-220/9.8-L·yml5circu1ating fluilized bed boiler and answeres are introduced,the causes ofhigh bed temperature and much desuperheat water flow are analyzed especiallyinthis paper.
Key Words circulating fluidized bed boiler commission bed temperature desuperheat Water
应明良 徐绍平 武仲言
省电力试验研究所(杭州 310014)
国内会议
北京
中文
346~351
1998-08-01(万方平台首次上网日期,不代表论文的发表时间)