ON-LINE MONITORING AND FAULT DIAGNOSIS OF AIR GAP AND STATOR BAR VIBRATION OF LARGE- SCALE HYDROGENERATOR BY USING RBF
EXPERIN AL INVESTIGATION ON FLOW IN GAP BETWEEN A ROTATING AND A STATIONARY DISK WITH LARGE FORCED THROUGH FLOW USING PIV
PUMP UNIT SELECTION IN EASTERN ROUTE OF SOUIH-TO-NORIH WATER DIVERSION PROJECT OF CHINA BASED ON RELIABILITY AND ECONOMY
TENTATIVE STUDY ON REAL-TIME DATA PROCESSING FOR ADVANCE DETECTION OF CAVITATION SURGE IN PUMP INDUCER
THE INFLUENCE OF GAS SUPPLY TO THE STABILITY OF THE LEFT BANK UNITS OF THREE GORGE HYDROPOWER PLANT OPERATING IN LOW HEAD