会议专题

The Application of the Magnitude Formula for Fitting Duration Time in Muchengjian Mine

  Mine earthquake belongs to mine microseismic,its magnitude measurement method is the result of all kinds of calculation methods of earthquake magnitude.Based on the definition,type and classification of earthquake magnitude,in combination with mine earthquake monitoring and orientation system of Muchengjian mine,calculating mine earthquake magnitude by vibration wave duration.In order to get the duration magnitude formula which is suitable for the mine area,adopting near earthquake magnitude calculation results to fit the magnitude calculation formula.Meanwhile analyse and compare the results between the duration of the magnitude after fitting and near earthquake magnitude.The results indicate that the fitting duration magnitude formula is appropriate for mine earthquake magnitude calculation of the mine,which is of great guiding significance to Muchengjian mine of magnitude determination.

magnitude near earthquake magnitude duration magnitude

Li Chengcheng Pan Yishan

School of Mechanics and Engineering, Liaoning Technical University,Fuxin, 123000, China

国际会议

International Symposium on Rock Mechanics and Mine Dynamic Disaster Prevention(岩石力学与矿井动力灾害防治国际学术研讨会)

辽宁阜新

英文

378-382

2013-07-13(万方平台首次上网日期,不代表论文的发表时间)