The Process DNA Model of Significant Model Project
To solve the problem of two command line existing in the significant model project management at present,this paper proposes a method of process DNA-based process management for significant model project.First,the technology process and management process of significant model project are analyzed.Second,the process DNA double-strand of significant model project is constructed employing the elements of technology and management as building blocks; and also,the two-level structure of the process DNA double-strand is analyzed.Third,the process DNA model of significant model project is established and the related formal definitions are given.
model project process DNA technology process management process
Bin Huai Haicheng Yang Neng Wan
The Key Laboratory of Contemporary Design and Integrated Manufacturing Technology, Ministryof Education, Northwestern Polytechnical University, Xian, 710072, China
国际会议
台湾
英文
504-508
2011-12-11(万方平台首次上网日期,不代表论文的发表时间)