Economic dispatching problem with Group and Resource Considerations
In many situations, economic dispatching with group and resource constrains is of considerable importance in electrical power system regulation. In this paper, an economic dispatching problem modeled by scheduling pattern under the consideration of group technology and resource constrains is investigated. In the proposed model, the setup time and processing time is constrained by resource, and the objective function is to minimize total resource consumption of setup time and jobs under makespan constrains. Based on some properties of the problem, an example is given to illustrate it.
Economic Dispatching Scheduling group technology resource constrains
Xiaoling Cui Yang Yan
School of Economics and Management, Liaoning Shihua University, Fushun, China Northeast China Bureau of State Electricity Regulatory Commission of China, Shenyang, China
国际会议
The 24th Chinese Control and Decision Conference (第24届中国控制与决策学术年会 2012 CCDC)
太原
英文
4131-4134
2012-05-23(万方平台首次上网日期,不代表论文的发表时间)