会议专题

MAINTENANCE DECISION-MAKING BASED TIME LIMITATION AND LIMITED RESOURCES ON BARRACKS

A fuzzy sets appraisal model is used in barracks maintenance decision-making. Project cost-time trade-off and some military factors are taken into consideration in the model.

FAN Min CHI Wei-sheng ZHANG Rui

Lecturer of Department of Airport Construction Engineering, University of Air Force Engineering. PhD Associate professor of Department of Airport Construction Engineering, University of Air Force Engin Section chief, Barracks Section of Air Force Certain unit

国际会议

第九届工程结构完整性国际会议(The Ninth International Conference on Engineering Structural Integrity Assessment)

北京

英文

2007-10-15(万方平台首次上网日期,不代表论文的发表时间)